For your information
You are being redirected to one of our divisional subsites which contains more detailed information on the required division. To navigate back to the main Invicta Group site, please click the link found in the footer at the bottom of the page.
As of April 2017
Minimum Headroom Required:
5000mm plus
As of April 2017
Retail Mezzanine Floors Installed:
45
As of April 2017
Storage/Production Mezzanine Floors Installed:
90
As of April 2017
Office Mezzanine Floors Installed:
238 Countries
As of April 2017
Multi-tier Mezzanine Floors Installed:
47
As of April 2017
Cost Saving Over Business Relocation:
Up to 80%
As of April 2017
Fastest Installation Time:
2.5 days
As of August 2017
Maximum Load Capacity:
Up to 1 ton per square metre
As of December 2017
Mezzanine Floor Relocations Completed:
32
Share/Like this page